Figure 3From: A general solution to the continuous-time estimation problem under widely linear processingMS errors for the SL estimator with n = 10 terms (crossed line) and for the WL estimator with n = 2 terms (dashed line) , with n = 4 terms (dotted line) , and with n = 10 terms (solid line).Back to article page