Figure 5From: On rate improvements and power saving with opportunistic relaying in home power line networksCCDF of achievable rate obtained using ODF with the relay located according to the various described configurations in single-sub-topology networks. The CCDF of capacity obtained assuming DT mode when no relay is connected to the network is also reported M = 1536.Back to article page